Visalia 1 1
Visalia 3

City of Visalia, Water Conservation Plant Upgrades

Wastewater Treatment

City of Visalia, Water Conservation Plant Upgrades

Visalia, California

Work on the Visalia Water Conservation Plant Upgrades project involves the upgrade of the existing trickling filter/activated sludge wastewater treatment plant, to a 22 MGD water recycling treatment plant that will produce water in conformance with California Administrative Code Title 22.

Construction includes an odor control system for the existing headworks; modification of the existing primary sedimentations basins; a new septage receiving station; a new pump station with fine screens; modifications to the existing aeration system; replacement of the existing secondary and tertiary treatment process with a new GE supplied membrane bioreactor (MBR) system, and an Ozonia supplied ultra-violet light (UV) disinfection system; improvements of the sludge digester system including modifications of the existing mixing systems within the seven existing digesters, a new 110 foot diameter digester with associated transfer pump station, a new digester gas holding system, and a new TWAS disintegration system; a new sludge dewatering system with sixteen new sludge drying beds; a recycled water pump station along with recycled water reservoirs; a renewable power generation system; installation of over ten miles of various sized pipelines; various building structures including a new Administration Building; site grading and paving; and plant wide electrical and instrumentation work.

Contract to Date: $103,499,235

Visalia 2
Visalia 4
Visalia 1