Orange County Sanitation District, Sludge Dewatering & Odor Control at Plant No. 1
Wastewater Treatment
Orange County Sanitation District, Sludge Dewatering & Odor Control at Plant No. 1
Orange County, California
This project constructed a new thickening and dewatering building and odor control system to replace the existing sludge handling systems for the 100 MGD plant. The construction included 14,000 CY of concrete, 32,000 SF of elevated deck shoring, 570 CIDH piles, approx. 85,000 LF of piping, multiple story structural steel, architectural, mechanical, fire control, plumbing, electrical and instrumentation and control systems for the new thickening and dewatering building, odor control system, two (2) new tunnels, valve vault, and a screen wall as well as rehabilitation of exiting silos and truck load-out facilities. Over $4 million of VE ideas were accepted by the client.
Contract to Date: $139,771,944